Template
1
0
Fork 0
mirror of https://codeberg.org/forgejo/forgejo synced 2024-11-28 20:56:11 +01:00
forgejo/vendor/go.opentelemetry.io/otel/RELEASING.md
6543 ac97ea573c
[Vendor] Update go-redis to v8.5.0 (#13749)
* Update go-redis to v8.4.0

* github.com/go-redis/redis/v8  v8.4.0 -> v8.5.0

* Apply suggestions from code review

Co-authored-by: zeripath <art27@cantab.net>

* TODO

* Use the Queue termination channel as the default context for pushes

Signed-off-by: Andrew Thornton <art27@cantab.net>

* missed one

Signed-off-by: Andrew Thornton <art27@cantab.net>

Co-authored-by: zeripath <art27@cantab.net>
2021-02-10 21:28:32 +00:00

82 lines
2.9 KiB
Markdown
Vendored

# Release Process
## Pre-Release
Update go.mod for submodules to depend on the new release which will happen in the next step.
1. Run the pre-release script. It creates a branch `pre_release_<new tag>` that will contain all release changes.
```
./pre_release.sh -t <new tag>
```
2. Verify the changes.
```
git diff master
```
This should have changed the version for all modules to be `<new tag>`.
3. Update the [Changelog](./CHANGELOG.md).
- Make sure all relevant changes for this release are included and are in language that non-contributors to the project can understand.
To verify this, you can look directly at the commits since the `<last tag>`.
```
git --no-pager log --pretty=oneline "<last tag>..HEAD"
```
- Move all the `Unreleased` changes into a new section following the title scheme (`[<new tag>] - <date of release>`).
- Update all the appropriate links at the bottom.
4. Push the changes to upstream and create a Pull Request on GitHub.
Be sure to include the curated changes from the [Changelog](./CHANGELOG.md) in the description.
## Tag
Once the Pull Request with all the version changes has been approved and merged it is time to tag the merged commit.
***IMPORTANT***: It is critical you use the same tag that you used in the Pre-Release step!
Failure to do so will leave things in a broken state.
***IMPORTANT***: [There is currently no way to remove an incorrectly tagged version of a Go module](https://github.com/golang/go/issues/34189).
It is critical you make sure the version you push upstream is correct.
[Failure to do so will lead to minor emergencies and tough to work around](https://github.com/open-telemetry/opentelemetry-go/issues/331).
1. Run the tag.sh script using the `<commit-hash>` of the commit on the master branch for the merged Pull Request.
```
./tag.sh <new tag> <commit-hash>
```
2. Push tags to the upstream remote (not your fork: `github.com/open-telemetry/opentelemetry-go.git`).
Make sure you push all sub-modules as well.
```
git push upstream <new tag>
git push upstream <submodules-path/new tag>
...
```
## Release
Finally create a Release for the new `<new tag>` on GitHub.
The release body should include all the release notes from the Changelog for this release.
Additionally, the `tag.sh` script generates commit logs since last release which can be used to supplement the release notes.
## Verify Examples
After releasing verify that examples build outside of the repository.
```
./verify_examples.sh
```
The script copies examples into a different directory removes any `replace` declarations in `go.mod` and builds them.
This ensures they build with the published release, not the local copy.
## Contrib Repository
Once verified be sure to [make a release for the `contrib` repository](https://github.com/open-telemetry/opentelemetry-go-contrib/blob/master/RELEASING.md) that uses this release.